Waste Water Engineering For a continuous flow type of sedimentation tanks Width of the tank is normally kept about 6 m Maximum horizontal flow velocity is limited to 0.3 m/minute Length of the tank is normally kept 4 to 5 times the width All listed here Width of the tank is normally kept about 6 m Maximum horizontal flow velocity is limited to 0.3 m/minute Length of the tank is normally kept 4 to 5 times the width All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A drop manhole is provided if A lamp is inserted to check obstruction A branch sewer joins the main sewer at higher level A sewer drops from a height None of these A lamp is inserted to check obstruction A branch sewer joins the main sewer at higher level A sewer drops from a height None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Rate of flow of sewage is generally assumed Less than the rate of water supply At 150 litres per capita More than the rate of water supply Equal to the rate of water supply Less than the rate of water supply At 150 litres per capita More than the rate of water supply Equal to the rate of water supply ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Dried sewage after treatment is used as Base material for paints Building material Fertilizer Chemical for lowering B.O.D. Base material for paints Building material Fertilizer Chemical for lowering B.O.D. ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For large sewers, maximum distance between manholes may be 200 m 100 m 300 m 50 m 200 m 100 m 300 m 50 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 8 to 16 hours 4 to 8 hours 24 to 36 hours 16 to 24 hours 8 to 16 hours 4 to 8 hours 24 to 36 hours 16 to 24 hours ANSWER DOWNLOAD EXAMIANS APP