Nuclear Power Engineering Extraction of uranium from its ore is done using __________ methods. Pyrometallurgical Physical beneficiation Chemical Electrometallurgical Pyrometallurgical Physical beneficiation Chemical Electrometallurgical ANSWER DOWNLOAD EXAMIANS APP
Nuclear Power Engineering Commercial power generation from fusion reactor is not yet possible, because It is difficult to initiate fusion reaction It is difficult to control fusion reaction Quantity of fuel required for initiating fusion reaction is prohibitively high The fuel required (e.g. deuterium and tritium) is scarce It is difficult to initiate fusion reaction It is difficult to control fusion reaction Quantity of fuel required for initiating fusion reaction is prohibitively high The fuel required (e.g. deuterium and tritium) is scarce ANSWER DOWNLOAD EXAMIANS APP
Nuclear Power Engineering Pressure of CO₂ gas (which is a coolant) in the Calder-Hall nuclear reactor is __________ kgf/cm² . 35 0.2 50 7 35 0.2 50 7 ANSWER DOWNLOAD EXAMIANS APP
Nuclear Power Engineering In a homogeneous nuclear reactor, the __________ are mixed together. None of these Fuel & coolant Fuel & moderato Coolant & moderator None of these Fuel & coolant Fuel & moderato Coolant & moderator ANSWER DOWNLOAD EXAMIANS APP
Nuclear Power Engineering If 4 gm of a radioisotope has a half life period of 10 days, the half life of 2 gm of the same istotope will be __________ days. 10 30 5 20 10 30 5 20 ANSWER DOWNLOAD EXAMIANS APP
Nuclear Power Engineering Uranium ore is currently mined & concentrated at Alwaye Khetri Jadugoda Ghatsila Alwaye Khetri Jadugoda Ghatsila ANSWER DOWNLOAD EXAMIANS APP