Waste Water Engineering Drop manholes are the manholes Without entry ladders Having drains at different levels Without manhole covers With depths more than 3.5 m Without entry ladders Having drains at different levels Without manhole covers With depths more than 3.5 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The normal values of over flow rates for sedimentation tanks using coagulant, ranges between 50,000 to 60,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, Organic and inorganic materials are separated Detention period is kept 3 to 4 minutes Flow velocity is kept 0.09 m/sec All listed here Organic and inorganic materials are separated Detention period is kept 3 to 4 minutes Flow velocity is kept 0.09 m/sec All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 14 days 12 days 7 days 2 days 14 days 12 days 7 days 2 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Cement concrete sewers are only suitable if non-scouring velocity is between 4.5 to 5.5 m/sec 3.0 to 4.0 m/sec 3.5 to 4.5 m/sec 2.5 to 3.0 m/sec 4.5 to 5.5 m/sec 3.0 to 4.0 m/sec 3.5 to 4.5 m/sec 2.5 to 3.0 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewers All listed here Must be of adequate size to avoid over flow Must be laid at least 2 to 3 m deep to collect /water from the basements Must flow under gravity ½ to ¾ full All listed here Must be of adequate size to avoid over flow Must be laid at least 2 to 3 m deep to collect /water from the basements Must flow under gravity ½ to ¾ full ANSWER DOWNLOAD EXAMIANS APP