Docks and Harbor Engineering A ship is berthed in a chamber and lifted by principles of buoyancy Such a chamber is called. Dry dock Refuge dock Floating dock Wet dock Dry dock Refuge dock Floating dock Wet dock ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering Minimum width of ship clearance shall be (where “B” is beam of the design vessel) 1.5 B or 50 m 1.5 B B or 30 m 50 m 1.5 B or 50 m 1.5 B B or 30 m 50 m ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering As per Berlin's formula, the length of wave in meters is given by(Where ’t’ is the period in seconds for two successive waves to pass the same section.) 1.7412 1.9412 1.5612 1.3412 1.7412 1.9412 1.5612 1.3412 ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering The most popular method of construction of wall breakwaters is None of these Low level method Staging method Barge method None of these Low level method Staging method Barge method ANSWER DOWNLOAD EXAMIANS APP
Docks and Harbor Engineering When a wave strikes a vertical breakwater in deep water, it is reflected back and on meeting another advancing wave of similar amplitude merges and rises vertically in a wall of water. This phenomenon is called Surf Clapotis Fetch Swell Surf Clapotis Fetch Swell ANSWER DOWNLOAD EXAMIANS APP