GETCO Exam Paper (30-11-2008) Directional over current relays have two exciting coils connected across _____ secondary's of two _____ phases T. & P.T., different T. & P.T., same T., different P.T., different T. & P.T., different T. & P.T., same T., different P.T., different ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) A CB under normal conditions, should be inspected once in a month 3 or 6 months a week 5 years a month 3 or 6 months a week 5 years ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The planning Commission was set up in March,1950 September, 1947 January, 1948 April, 1947 March,1950 September, 1947 January, 1948 April, 1947 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) An AC transmission line requires a VAR input: to improve stability to reduce losses to improve the regulation to increase power transmission to improve stability to reduce losses to improve the regulation to increase power transmission ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The number of pilot wires required for protecting 3-phase transmission lines using Translay System of protection is 3 6 4 2 3 6 4 2 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The delay fuses are used for protection of light circuits fluorescent lamp none of these motors light circuits fluorescent lamp none of these motors ANSWER DOWNLOAD EXAMIANS APP