Chemical Engineering Plant Economics Construction expenses are roughly __________ percent of the total direct cost of the plant. 2 50 30 10 2 50 30 10 ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Payback period Is the length of time over which the earnings on a project equals the investment All of these Is affected by the variation in earnings after the recovery of the investment And economic life of a project are the same Is the length of time over which the earnings on a project equals the investment All of these Is affected by the variation in earnings after the recovery of the investment And economic life of a project are the same ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Expenditure on research and development (R & D) is categorised as the __________ , while making an estimate of the total product cost for a chemical plant. Fixed expenses Direct production cost General expenses Overhead cost Fixed expenses Direct production cost General expenses Overhead cost ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics Which of the following is the cheaptest material of construction for the storage of sodium hydroxide upto a concentration of 75%? Stainless steel Plain carbon steel Nickel Copper Stainless steel Plain carbon steel Nickel Copper ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics An investment of Rs. 100 lakhs is to be made for construction of a plant, which will take two years to start production. The annual profit from the operation of the plant is Rs. 20 lakhs. What will be the pay back time? 10 years 7 years 5 years 12 years 10 years 7 years 5 years 12 years ANSWER DOWNLOAD EXAMIANS APP
Chemical Engineering Plant Economics A present sum of Rs. 100 at the end of one year, with half yearly rate of interest at 10%, will be Rs. 97 121 110 91 97 121 110 91 ANSWER DOWNLOAD EXAMIANS APP