Environmental Engineering Chlorine demand of water is equal to Difference of applied and residual chlorine Sum of applied and residual chlorine Residual chlorine Applied chlorine Difference of applied and residual chlorine Sum of applied and residual chlorine Residual chlorine Applied chlorine ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Cleaning is done by (i) Scraping and removal in filters slow sand (ii) Back washing in slow sand filters (iii) Scraping and removal in filters rapid sand (iv) Back washing in rapid sand filters The correct answer is (ii) and (iii) (ii) and (iv) (i) and (iv) (i) and (ii) (ii) and (iii) (ii) and (iv) (i) and (iv) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The devices which are installed for drawing water from the sources are called Intakes Aquiclude Filters Aquifers Intakes Aquiclude Filters Aquifers ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The length of rectangular sedimentation tank should not be more than (Where ‘B’ is the width of the tank) B 2B 4B 8B B 2B 4B 8B ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering The hydraulic mean depth (HMD) for an egg-shaped sewer flowing two-third full is None of these Less than HMD when flowing full Equal to HMD when flowing full Greater than HMD when flowing full None of these Less than HMD when flowing full Equal to HMD when flowing full Greater than HMD when flowing full ANSWER DOWNLOAD EXAMIANS APP
Environmental Engineering Generally the detention period for grit chambers is kept as 12 hours 24 hours 1 minute 5 minutes 12 hours 24 hours 1 minute 5 minutes ANSWER DOWNLOAD EXAMIANS APP