Engineering Economics Capitalized cost of a project is also known as ______. Infinite cost Life cycle cost Project cost Life cost Infinite cost Life cycle cost Project cost Life cost ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics What is defined as the reduction or fall of the value of an asset due to constant use and passage of time? Inflation Deflation Depreciation Depletion Inflation Deflation Depreciation Depletion ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics A P 1,000,000 issue of 3%, 15-year bond was sold at 95%. What is the rate of interest of this investment? 0.04 0.03 0.037 0.034 0.04 0.03 0.037 0.034 ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics What is the factor name of the formula (1+i)^-n? Single payment present worth Capital recovery Single payment compound amount Uniform gradient future worth Single payment present worth Capital recovery Single payment compound amount Uniform gradient future worth ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics Pick up the main purpose of project cost control from the following: To signal immediate warning of uneconomic operations To provide a feed back to the estimator To promote cost consciousness All of these To signal immediate warning of uneconomic operations To provide a feed back to the estimator To promote cost consciousness All of these ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics What refers to the cumulative effect of elapsed time on the money value of an event, based on the earning power of equivalent invested funds capital should or will earn? Present worth factor Interest rate Yield Time value of money Present worth factor Interest rate Yield Time value of money ANSWER DOWNLOAD EXAMIANS APP