Engineering Economics Capitalized cost of a project is also known as ______. Life cost Infinite cost Life cycle cost Project cost Life cost Infinite cost Life cycle cost Project cost ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics Pick up the correct reason for making conceptual (or preliminary) estimate from the following: All of these To compute target estimate for the owner while drawing and specifications are in initial stage To have a check on a definitive cost estimate To check quotations from contractors and/or sub-contractors All of these To compute target estimate for the owner while drawing and specifications are in initial stage To have a check on a definitive cost estimate To check quotations from contractors and/or sub-contractors ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics What refers to the amount of a product made available for sale? Supply Good Demand Product Supply Good Demand Product ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics What refers to the need, want or desire for a product backed by the money to purchase it? Product Good Demand Supply Product Good Demand Supply ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics A student plans to deposit P1,500 in the bank now and another P3,000 for the next 2 years. If he plans to withdraw P5,000 three years from after his last deposit for the purpose of buying shoes, what will be the amount of money left in the bank after one year of his withdrawal? Effective annual interest rate is 10%. P1,345.98 P1,459.64 P1,549.64 P1,945.64 P1,345.98 P1,459.64 P1,549.64 P1,945.64 ANSWER DOWNLOAD EXAMIANS APP
Engineering Economics The Saudi Arabian Oil Refinery developed an oil well which is estimated to contain 5,000,000 barrels of oil at an initial cost of $ 50,000,000. What is the depletion charge during the year where it produces half million barrels of oil? Use Unit or Factor method in computing depletion. 5000000 5025000 5010000 5050000 5000000 5025000 5010000 5050000 ANSWER DOWNLOAD EXAMIANS APP