GETCO Exam Paper (30-11-2008) Burden of the relay is _____ rating of relay current voltage volt-amp. watt current voltage volt-amp. watt ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) If the +Ve, -Ve & zero sequence reactances of an elements of a power system are 0.3, 0.3 & 0.8 p.u. respectively, the element would be transmission line synchronous generator synchronous motor static load transmission line synchronous generator synchronous motor static load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) The load carrying capability of a long transmission line is increased at low ambient air temperature is always limited by conductor area both (a) & (b) may be limited by stability considerations is increased at low ambient air temperature is always limited by conductor area both (a) & (b) may be limited by stability considerations ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) In an over current protection, the setting of earth fault relay is _____ the phase fault relay. more than equal to not related in less than more than equal to not related in less than ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) Which of the following inernational body is associated / collaborating in the National 'Population Education Programme' in the country? WHO UNESCO UNFPA IMF WHO UNESCO UNFPA IMF ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (30-11-2008) On a long high voltage transmission line with heavy load, VAR compensation can be provided by using series capacitors shunt capacitors series inductive reactors shunt inductive reactors series capacitors shunt capacitors series inductive reactors shunt inductive reactors ANSWER DOWNLOAD EXAMIANS APP