Chemical Reaction Engineering
BET apparatus is used to determine the

Porosity of the catalyst bed
Pore size distribution
Specific surface of a porous catalyst
Pore diameter

ANSWER DOWNLOAD EXAMIANS APP

Chemical Reaction Engineering
A space time of 3 hours for a flow reactor means that

It takes three hours to dump the entire volume of the reactor with feed
Conversion is cent per cent after three hours
Three reactor volumes of feed can be processed every hour
The time required to process one reactor volume of feed (measured at specified conditions) is 3 hours