Power Systems An hydro-graph indicates All of these the average run off during the period. the maximum and minimum run off during the period. the discharge at any time during the period under consideration. All of these the average run off during the period. the maximum and minimum run off during the period. the discharge at any time during the period under consideration. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Mho relay is usually employed for protection of medium transmission lines only long transmission lines only short transmission lines only any line medium transmission lines only long transmission lines only short transmission lines only any line ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydro electric generating station is supplied from a reservoir of capacity 5 × 10 − 6 cubic meters at a head of 200 meters. Find the total energy available in KWh if the overall efficiency is 75 % 5 × 106 kWh. 4.06 × 106 kWh. 3 × 106 kWh. 2.044 × 106 kWh. 5 × 106 kWh. 4.06 × 106 kWh. 3 × 106 kWh. 2.044 × 106 kWh. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power transfer capability of transmission line can be increased by Using bundled conductors Using series capacitance Parallel transmission lines All of these Using bundled conductors Using series capacitance Parallel transmission lines All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line has its conductors at the corners of an equilateral triangle with side 3m. The diameter of each conductor is 1.63 cm. The inductance of the line per phase per km is 1.182 mH 1.093 mH 1.232 mH 1.043 mH 1.182 mH 1.093 mH 1.232 mH 1.043 mH ANSWER DOWNLOAD EXAMIANS APP
Power Systems When reactance grounding is used in network, the voltage between neutral and ground is 3×IR0 × Xn IN × Xn IR0 × Xn both 1 and 3 3×IR0 × Xn IN × Xn IR0 × Xn both 1 and 3 ANSWER DOWNLOAD EXAMIANS APP