Irrigation Engineering According to Lacey, in regime conditions Entire cross-section of the channel is generated at all points by the forces normal to the Both (a) and (b) Neither (a) nor (b) Silt is kept in suspension by vertical components of eddies Entire cross-section of the channel is generated at all points by the forces normal to the Both (a) and (b) Neither (a) nor (b) Silt is kept in suspension by vertical components of eddies ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For standing crops in undulating sandy fields, the best method of irrigation, is Sprinkler irrigation Check method Furrow method Free flooding Sprinkler irrigation Check method Furrow method Free flooding ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The ratio of the discharge over a trapezoidal crest to a rectangular crest of Sarda falls of identical parameters, is 1.084 1.074 1.064 1.054 1.084 1.074 1.064 1.054 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The most suitable location of a canal head work, is Trough stage of the river Rock stage of the river Boulders stage of the river Delta stage of the river Trough stage of the river Rock stage of the river Boulders stage of the river Delta stage of the river ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The width of a dowla is generally kept between 30 to 60 cm and its height above the road level should invariably be more than 40 cm 30 cm 10 cm 20 cm 40 cm 30 cm 10 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The maximum permissible eccentricity for no tension at the base of a gravity dam is B/2 B/3 B/6 B/4 B/2 B/3 B/6 B/4 ANSWER DOWNLOAD EXAMIANS APP