Power Systems A transmission line has a reactance of 1 Pu is operating at Vs = Vr = 1 Pu. The generator is connected at source end which is delivering 0.5 Pu of active power. Find the load angle? 45° 60° 30° 35° 45° 60° 30° 35° ANSWER DOWNLOAD EXAMIANS APP
Power Systems To improve the efficiency of thermal power plant ________________ is placed between boiler and turbine. economizer. air preheater. superheater. ash handling point. economizer. air preheater. superheater. ash handling point. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where do compounding done in thermal power plants Coal handling plant. Ash handling plant. Turbine. Generator. Coal handling plant. Ash handling plant. Turbine. Generator. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Thermal shielding is provided to All of these absorb the fast neutron. protected the operating personal from exposure to radiations. prevent the reactor wall from getting heated. All of these absorb the fast neutron. protected the operating personal from exposure to radiations. prevent the reactor wall from getting heated. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Zero sequence currents can flow from a line into a transformer bank if the windings are in star / grounded star. delta / delta. delta / star. ground star / delta. star / grounded star. delta / delta. delta / star. ground star / delta. ANSWER DOWNLOAD EXAMIANS APP
Power Systems NTPC (National Thermal Power Cooperation) has its only thermal power generating unit in West Bengal at Katwa. Bakreshwar. Farakka. Durgapur. Katwa. Bakreshwar. Farakka. Durgapur. ANSWER DOWNLOAD EXAMIANS APP