Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. The plant capacity factor for the station is 1 0.5 0.75 0.6 1 0.5 0.75 0.6 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 400 KV network, 360 KV is recorded at a 400 KV bus. The reactive power absorbed by shunt rated for 50 MVAr, 400 KV connected at the bus is 61.73 MVAr. 55.56 MVAr. 40.5 MVAr. 45 MVAr. 61.73 MVAr. 55.56 MVAr. 40.5 MVAr. 45 MVAr. ANSWER DOWNLOAD EXAMIANS APP
Power Systems When is the ferranti effect on long overhead lines experienced? The line is lightly loaded The line is heavily loaded The line is fully loaded The power factor is unity The line is lightly loaded The line is heavily loaded The line is fully loaded The power factor is unity ANSWER DOWNLOAD EXAMIANS APP
Power Systems When a pumped storage power plant is operated in conjunction with a steam power plant the operating cost of the steam plant become optimum load factor of the steam plant is increased All of these chances of the tripping of the system decrease the operating cost of the steam plant become optimum load factor of the steam plant is increased All of these chances of the tripping of the system decrease ANSWER DOWNLOAD EXAMIANS APP
Power Systems Length of short transmission line is up to any of the above 150 km 80 km 40 km any of the above 150 km 80 km 40 km ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which power plant cannot have single unit of 100 MW capacity Hydro electric power plant. Nuclear power plant. Steam power plant. Diesel engine plant. Hydro electric power plant. Nuclear power plant. Steam power plant. Diesel engine plant. ANSWER DOWNLOAD EXAMIANS APP