Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. The plant capacity factor for the station is 0.75 1 0.6 0.5 0.75 1 0.6 0.5 ANSWER DOWNLOAD EXAMIANS APP
Power Systems As the frequency of the system is increased, the charging MVAR increases decreases remains unaffected None of these increases decreases remains unaffected None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)? 2 × 106 kV / sec. 3 × 106 kV / sec. 3.5 × 106 kV / sec. 1 × 106 kV / sec. 2 × 106 kV / sec. 3 × 106 kV / sec. 3.5 × 106 kV / sec. 1 × 106 kV / sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Offset mho relay is used for the protection of equipment when failure of prime mover of the generator either 1 or 2 None of these loss of excitation of the generator failure of prime mover of the generator either 1 or 2 None of these loss of excitation of the generator ANSWER DOWNLOAD EXAMIANS APP
Power Systems ACSR means Aluminium conductor steel reinforced Aluminium core steel reinforced Aluminium copper steel reinforced all conductor steel reinforced Aluminium conductor steel reinforced Aluminium core steel reinforced Aluminium copper steel reinforced all conductor steel reinforced ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a long transmission line, if we increase the length of the line, the parameters A and B respectively decreases and increases increases and increases increases and decreases decreases and decreases decreases and increases increases and increases increases and decreases decreases and decreases ANSWER DOWNLOAD EXAMIANS APP