GETCO Exam Paper (11-06-2017) A fuse is never inserted in phase wire normally inserted in neutral wire never inserted in neutral wire normally inserted in phase wire never inserted in phase wire normally inserted in neutral wire never inserted in neutral wire normally inserted in phase wire ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Water hammer occurs in turbine casing surge tank penstock draft tube turbine casing surge tank penstock draft tube ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The most accurate and versatile method of achieving power compensation is by using fixed capacitor with controlled reactor switched capacitors saturable reactor with capacitor bank switched capacitor with controlled reactors fixed capacitor with controlled reactor switched capacitors saturable reactor with capacitor bank switched capacitor with controlled reactors ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The current through series RLC circuit under resonance condition will be V/XC none V/XL V/R V/XC none V/XL V/R ANSWER EXPLANATION DOWNLOAD EXAMIANS APP For series resonace circuit,Z = RI = ImaxI = V/Z = V/R
GETCO Exam Paper (11-06-2017) The Mid Day meal scheme was launched on August 15, 1992 August 15, 1995 August 15, 2001 August 15, 2000 August 15, 1992 August 15, 1995 August 15, 2001 August 15, 2000 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Steady state stability of a power system is improved by single pole switching decreasing generator inertia reducing fault clearing time using double circuit line instead of single circuit line single pole switching decreasing generator inertia reducing fault clearing time using double circuit line instead of single circuit line ANSWER DOWNLOAD EXAMIANS APP