Irrigation Engineering A divide wall is provided At an inclination to the axis of weir Parallel to the axis of weir and upstream of it Parallel to the axis of weir and downstream of it At right angle to the axis of weir At an inclination to the axis of weir Parallel to the axis of weir and upstream of it Parallel to the axis of weir and downstream of it At right angle to the axis of weir ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Seepage through embankments in an earthen dam is controlled by relief wells provision of downstream berms drain trenches drainage filters relief wells provision of downstream berms drain trenches drainage filters ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following methods of applying water may be used on rolling land ? free flooding check flooding furrow flooding boarder flooding free flooding check flooding furrow flooding boarder flooding ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The difference in level between the top of a bank and supply level in a canal, is called Free board None of these Berm Height of bank Free board None of these Berm Height of bank ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Instantaneous unit hydrograph is a hydrograph ofi) unit durationii) unit rainfall excessiii) infinitely small durationiv) infinitely small rainfall excessThe correct answer is (i)and(iv) (ii) and (iii) (i) and (ii) (iii) and (iv) (i)and(iv) (ii) and (iii) (i) and (ii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following spillways is least suitable for an earthen dam ? shaft spillway ogee spillway chute spillway side channel spillway shaft spillway ogee spillway chute spillway side channel spillway ANSWER DOWNLOAD EXAMIANS APP