Industrial Engineering and Production Management A-B-C analysis Does not depend upon the unit cost of the item but on its annual consumption Is meant for relative inventory control Is a basic technique of materials management All of the these Does not depend upon the unit cost of the item but on its annual consumption Is meant for relative inventory control Is a basic technique of materials management All of the these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Inventory management consists of Stock control system All of these State of merchandise methods of storing and maintenance etc. Effective running of stores Stock control system All of these State of merchandise methods of storing and maintenance etc. Effective running of stores ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Work sampling is applied for Estimating the percentage of the time consumed by various job activities Estimation of the percentage utilization of machine tools Finding out time standards, specially where the job is not repetitive and where time study by stop watch method is not possible All of these Estimating the percentage of the time consumed by various job activities Estimation of the percentage utilization of machine tools Finding out time standards, specially where the job is not repetitive and where time study by stop watch method is not possible All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The time which results in the least possible direct cost of an activity is known as Crash time Slow time Standard time Normal time Crash time Slow time Standard time Normal time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The reasons which are basically responsible for the formation of a queue should be that Output rate is constant and the input varies in a random manner Output rate is linearly proportional to input The average service rate Hess than the average arrival rate All of these Output rate is constant and the input varies in a random manner Output rate is linearly proportional to input The average service rate Hess than the average arrival rate All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The probability distribution of project completion in PERT follows following distribution Binomial Exponential Normal Gaussian Binomial Exponential Normal Gaussian ANSWER DOWNLOAD EXAMIANS APP